Stand by Vol. III No. 2 · May–Jun 2026 Doors 19:00 · Load-in 14:00 Dispatch 615 · 555 · 0418 On call · 24h
Briley Stage Power Co. Touring & theatrical power · Cowan St · Nashville

Vol. III No. 2
Issue 2026-05
Advance a tour →

Department · 01 · p.07

Protocols — the catalog, in six entries.

Touring electrical is a finite list. We ship the six scopes below, by ETCP card and TN state credential, against NEC 2023 and the Metro Nashville local amendments. Anything outside is referred out.

Every scope below has a full data sheet at the linked detail page — feeder gauge, distro family, NEC article, ETCP cert required, lead-time in working days, price band, and the kit components we carry on the truck for that scope. The numbers (P-01 through P-06) are how we file work in the shop log; they appear on every advance, every cable label, and every invoice. The numbering will not change.

The catalog, as a Table of Contents

No. Scope Gauge / scale NEC article Lead time Read
P-01 Cam-Lok & cable feeder runs 4/0 & #2 Type W · 400 A 1-pole 520.53(B), 590.4 3 working days p.08 →
P-02 Distro builds & rentals 100 A – 400 A · Motion Labs · Lex 520.27, UL 1640 5 working days (rental); 4 weeks (build) p.10 →
P-03 Generator paralleling 2 × 100 kW to 3 × 350 kW · Woodward easYgen-3500 445, 700, IEEE 142 5 working days p.12 →
P-04 Stage-rigging electrical ETCP card required · 480 V motors · 120 V fixtures 520, ANSI E1.19 3 working days p.14 →
P-05 Broadcast remote power OB-van service · isolated tech · TVSS 647, 250.97 4 working days p.15 →
P-06 Festival temporary service NEC 525 temp · 200 A – 1,200 A aggregate 525, 590, NFPA 70B 10 working days p.17 →

Work that is not us

To save everyone time on the advance: we do not work the following, and we have not for nine years. We refer out to shops we trust.

How a scope becomes a tour

Every booking turns into a production reference (PRD-YYYY-NNN) on the day we sign. From there, the catalog drives the paperwork: P-01 feeder gets a topology diagram and a cable manifest; P-02 distros get a phase-rotation test sheet; P-03 gen-paralleling gets a load-shed program and a frequency-droop curve; P-04 rigging-class circuits get a pre-LOTO walkthrough; P-05 broadcast gets a single-point grounding audit; P-06 festival temp gets a daily GFCI & Megger log. The paperwork is the work. We file every sheet at the end of cycle in the colophon binder, which sits on a shelf at the bay door.

If you’re advancing a show, the /advance/ page has the form. We need the stage plot, the rider, the gauge plan, and the load-in window. We answer dispatch within four working hours.

Read the protocols one by one

P-01

Cam-Lok & cable feeder runs

4/0 & #2 Type W · 400 A 1-pole · NEC 520.53(B)

Series E single-pole Cam-Lok feeder runs from the venue tie-in to FOH, monitors, lighting, video, and rigging distros — hand-coiled, hand-numbered, Megger-tested before every pull.

Read protocol →

P-02

Distro builds & rentals

Motion Labs PD-series · Lex BNCB · UL 1640

Roadcase distros for 100 A through 400 A 3-phase service, with Edison, L6-30, twist-lock L21, and Socapex 19-pin output. Phase rotation verified before every load-in.

Read protocol →

P-03

Generator paralleling

Cat XQ · Multiquip DCA · Woodward easYgen-3500

Two- and three-set paralleled diesel banks; kW & kVAR share at the easYgen, switched-neutral grounding to NEC 250 and IEEE 142, load-shed schedule prepared before run-up.

Read protocol →

P-04

Stage-rigging electrical

ETCP Entertainment Electrician · NEC 520 · ANSI E1.19

Rigged-position circuits — chain motors, fixtures, follow-spots, hanging audio. Strain relief, separation from rigging hardware, locked-out and tagged at every pick.

Read protocol →

P-05

Broadcast remote power

Isolated technical · single-point ground · TVSS

OB-van service, headend technical power, audio isolation transformers, ground-loop audit. We work with NEP, Game Creek, and broadcast’s usual road trucks.

Read protocol →

P-06

Festival temporary service

NEC 525 · NFPA 70B · Metro Codes temp permit

Multi-stage festival temporary service. Pole-mount disconnects, GFCI on every public-accessible receptacle, daily readings logged in the green book at the dispatch tent.

Read protocol →